PLANNING COMMISSION ACTIONS OF MARCH 19, 2018

8.1       Motion by Commissioner Williams, supported by Commissioner Harris, to approve the Final Site Plan for CSPA 16-08 Arbor Ridge Crossing Phase 3.

ROLL CALL

YES:               THOMPSON, HARRIS, PAYNE, WILLIAMS, KIBLER, RALPH

            NO:                 None

            ABSENT:       YI

            ABSTAIN:     None

            MOTION CARRIED


8.2       Motion by Commissioner Williams, supported by Commissioner Harris, to approve
the final site plan for CSPA 17-17 Fountain Blue (fka Lohr Road Townhomes)
with the following conditions:

      1. The photo-metric plan is approved as part of final engineering review;
      2. The Building Department confirms that the following architectural requirements have been met as part of building permit review:
        • All units to have full depth brick on all sides as indicated
        • Siding to be done in Hardy Board, cement board or equivalent material (no vinyl siding is allowed)
        • Buildings must meet minimum building energy standards
        • Hot water systems will be high efficiency meeting or exceed energy code
        • All windows to be double pane and meet or exceed energy code
        • All HVAC systems to be high efficient to meet or exceed energy code
        • All windows and doors shall meet or exceed energy code
        • All units to have 2 x 6 exterior walls with full insulation


ROLL CALL

YES:               KIBLER, PAYNE, WILLIAMS, HARRIS, RALPH, THOMPSON

            NO:                 None

            ABSENT:       Yi

            ABSTAIN:     None

            MOTION CARRIED