US-12/US-23 Bridge and Interchange Weekly Update:
March 17, 2023
- On US23: Inside lane closure for temporary concrete barrier/crossover construction, outside patching will begin on NB US-23
- US-12 Interchange: Ramp A (NB US-12 exit to US-12) will begin work, first with the installation of the temporary signal poles. Excavation continues at interchanges for utility relocations. Sign removals will begin on US-12. Soil erosion and sedimentation control measures will continue to be installed and maintained.