Construction Update for US 12/23 Bridge and Interchange for the week of 05-08-23 are as follows:
US23:
- On northbound US-23, 2 lanes will be maintained, utilizing the outside shoulder and right lane. The contractor working in the median area of northbound US-23.
- Contractors continue to cut and build the grade in the median of NB US23 to include, excavation and aggregate. The contractor will be HMA paving on northbound inside shoulder at night
- There will be nightly single lane closures anticipated on NB/SB US-23 through 5/19/2023
US-12 Interchange:
- Traffic switch scheduled for the middle of this week. There will be 1 lane per direction maintained on northernly section of US-12.
- Bridge construction begins at US-12 bridge
- Potential short term flagging operation between 9am-3pm (when traffic allows) for material delivery trucks leaving loop ramps on NW and SE quadrants.